Step 4: Prioritize with P0/P1/P2

Priority Framework

PriorityCriteriaTimeline
P0Blocks daily operations; high frequency; high impact if missedWeek 1-2
P1Important but not blocking; medium frequency; improves efficiencyWeek 3-4
P2Nice-to-have; low frequency; optimizationWeek 5+

Scoring Heuristic

For each build, score these dimensions:

DimensionWeightScore 1-3
Frequency (how often it runs)High1=monthly, 2=weekly, 3=daily+
Time saved (manual effort replaced)High1=<5min, 2=5-30min, 3=30min+
Error risk (cost of human mistake)Medium1=low, 2=medium, 3=high
Dependency (other builds need this)Medium1=standalone, 2=some, 3=critical path

P0 = total score 9+, P1 = 6-8, P2 = below 6.

Output

A priority roadmap structured as:

Phase 1: Core Operations (Week 1-2) — P0

The builds that block daily operations.

Phase 2: Expansion (Week 3-4) — P1

Important improvements, not blocking.

Phase 3: Advanced Automation (Week 5+) — P2

Nice-to-have optimizations.